8eb7c0a018398c47fe971852ce3d7b66ckdnz.png

Use the last rendered image as the exact approved base.

Everything is correct and must remain unchanged in geometry, proportions, camera angle, layout and dimensions.

Do NOT modify walls.
Do NOT resize rooms.
Do NOT move partitions.
Do NOT change corridor width.
Do NOT alter any numeric dimensions or labels.

Only modify the furniture inside the FIRST cubicle of each unit from left to right.

The first cubicle in both units must now function as a reception / lobby area.

Important access condition:
The entrance door is centered in that first cubicle.
Furniture must be oriented considering a central door access.

Leave a clear central circulation path aligned with the door swing / opening clearance.
Maintain proper door abatment clearance.

The circulation adjustment applies ONLY inside the reception cubicles.

Keep exact same room dimensions and geometry.

Replace furniture with:

Reception desk positioned to allow central access flow

2–3 waiting chairs arranged without blocking the door swing

Subtle decorative element plant or small table

All other cubicles and areas must remain EXACTLY as currently rendered.

Do not modify any other furniture.
Do not change lighting.
Do not reinterpret spatial configuration.

Maintain identical isometric camera angle.

Treat geometry as CAD-locked.
Zero spatial transformation allowed.
Strict dimensional fidelity required., keep exact camera angle

PromptUse the last rendered image as the exact approved base.

Everything is correct and must remain unchanged in geometry, proportions, camera angle, layout and dimensions.

Do NOT modify walls.
Do NOT resize rooms.
Do NOT move partitions.
Do NOT change corridor width.
Do NOT alter any numeric dimensions or labels.

Only modify the furniture inside the FIRST cubicle of each unit (from left to right).

The first cubicle in both units must now function as a reception / lobby area.

Important access condition:
The entrance door is centered in that first cubicle.
Furniture must be oriented considering a central door access.

Leave a clear central circulation path aligned with the door swing / opening clearance.
Maintain proper door abatment clearance.

The circulation adjustment applies ONLY inside the reception cubicles.

Keep exact same room dimensions and geometry.

Replace furniture with:

Reception desk positioned to allow central access flow

2–3 waiting chairs arranged without blocking the door swing

Subtle decorative element (plant or small table)

All other cubicles and areas must remain EXACTLY as currently rendered.

Do not modify any other furniture.
Do not change lighting.
Do not reinterpret spatial configuration.

Maintain identical isometric camera angle.

Treat geometry as CAD-locked.
Zero spatial transformation allowed.
Strict dimensional fidelity required., keep exact camera angle

Date26 February 2026

Share