Skip to content
Render tools
Create a photorealistic aerial construction visualisation for Rockhampton Sports Precinct – Stage 4 Netball Court Foundations.

CRITICAL INSTRUCTION

Use the supplied Netball Court Foundations overlay image as the master reference.

Maintain the EXACT:
- camera angle
- aerial viewpoint
- orientation
- image extent
- scale
- zoom level
- site footprint

The final image must appear as the same aerial photograph taken later during construction.

Do not rotate.
Do not crop.
Do not zoom.
Do not alter site boundaries.

The overlay geometry controls all construction locations.

Only construct works where shown on the overlay.

COURT FOUNDATION AREA

The red outlined court rectangles indicate the exact future netball court locations.

Remove the red outline graphics.

Replace the red outline areas with realistic court foundation construction works.

Show:

- Stabilised subgrade completed.
- Crushed rock sub-base construction.
- Basecourse preparation.
- Root barrier installation around court edges.
- Slotted trench drains being installed.
- Concrete edge strips where appropriate.
- Survey crews checking levels.
- Workers preparing court foundations.
- Rollers compacting court bases.
- Water carts controlling dust.
- Multiple court foundations progressing simultaneously.

The court areas should appear as engineered foundation platforms ready for asphalt paving.

No court colours.

No line marking.

No goal posts.

No fencing.

The court footprints must remain exactly in the locations shown on the overlay.

CARPARK AREA

The grey shaded carpark area indicates the exact future carpark footprint.

Show:

- Gravel placement underway.
- Crushed rock pavement installation.
- Compacted gravel subgrade.
- Basecourse being spread and levelled.
- Rollers compacting gravel.
- Survey crews checking levels.
- Excavators trimming pavement edges.

The carpark should appear under construction.

Do not show asphalt.

Do not show line marking.

Do not show completed parking bays.

BUILDINGS

Show only:
- Prepared clubhouse building platform.
- Prepared amenities building platform.
- Minor footing excavation if visible.

No structural steel.
No roofs.
No building framing.

SITE CONDITION

Bulk earthworks are substantially complete.

Civil services are substantially complete.

Court foundations are actively being constructed.

The image should clearly represent the stage immediately before asphalt paving commences.

VISUAL STYLE

Photorealistic drone photograph.
Professional construction methodology visual.
Government tender presentation quality.
Queensland construction environment.
High realism.
Natural lighting.

NO red outline boxes.

NO overlay graphics.

NO coloured court surfaces.

NO blue courts.

NO red courts.

NO acrylic surfacing.

NO line marking.

NO goal posts.

NO sports lighting.

NO fencing.

NO completed courts.

NO clubhouse structure.

NO amenities structure.

NO steel framing.

NO roof framing.

NO asphalt carparks.

NO completed roads.

NO landscaping.

NO playgrounds.

NO youth precinct structures.

NO works outside the overlay footprint.

NO alterations to site geometry.

NO alterations to camera angle.

The red court outlines are reference geometry only and must be replaced with realistic court foundation construction works.

Create renders like this

Turn any photo, sketch, or floor plan into a photoreal render in seconds.