- Prompt
- Use the provided construction sequence image as the base model and maintain the scene geometry EXACTLY as shown. Camera & Geometry Lock (CRITICAL): Maintain the exact camera position, angle, lens, perspective, and framing. Do NOT move, scale, rotate, or reinterpret any building, structure, or site element. All objects must remain in their exact coordinates and footprint. Building Height Constraint (STRICT – NO CHANGE PERMITTED): The building height must remain exactly the same as the original illustration. Do NOT increase or decrease wall height. Do NOT add additional levels, intermediate floors, or vertical extensions. Steel framing MUST terminate at the exact same top-of-wall height as the original structure. Roof truss springing height and top-of-structure level must remain unchanged. Construction Stage Update (ONLY permitted building change): Remove all external wall cladding and solid wall elements. Replace these with exposed blue structural steel framing (columns, studs, beams). Ensure framing aligns precisely with original wall positions and building footprint. Do NOT alter spacing, grid, or structural layout beyond replacing the wall material. Roof Structure Control (STRICT): Keep all roof trusses in EXACTLY the same positions as shown. All trusses must run vertically in the same direction across the building. The roof is flat — no pitch, no gables, no angled or triangular trusses. Do NOT change truss height, spacing, orientation, or geometry. Do NOT add roof sheeting — maintain open truss stage only. Site Office Control: Ensure there are only two site offices. Position them side-by-side at ground level. Do NOT stack, duplicate, or relocate them. Reference Image Matching (Sequence Consistency): Match the reference image exactly for: Background environment Lighting and shadow direction Colour tone, grading, and realism Update site fencing to match the reference: Blue mesh panel fencing Correct spacing, height, posts, and base supports Maintain identical fence alignment and perimeter Site & Context Controls: Do NOT modify site layout, ground levels, access roads, or surrounding buildings. Do NOT add or remove any vehicles, plant, vegetation, or materials. Keep all existing elements exactly as per the base image. Sequence Consistency Requirements: Ensure full alignment with previous and future sequence frames Maintain identical: Camera framing Lighting conditions Scale and proportions Rendering Quality: Photorealistic output Clean, sharp blue steel framing with accurate proportions Realistic shadows cast from trusses and framing STRICT CONSTRAINTS: Do NOT change building height or levels Do NOT alter perspective, footprint, or proportions Do NOT introduce new geometry or structural interpretation ONLY modify: Wall removal → steel framing replacement Maintain flat vertical trusses Site office correction Fencing + visual match to reference
- Created
- June 25, 2026