Skip to content
Render tools
Use the provided construction sequence image as the base model and maintain the scene geometry EXACTLY as shown.

Camera & Geometry Lock (CRITICAL):

Maintain the exact camera position, angle, lens, perspective, and framing.
Do NOT move, scale, rotate, or reinterpret any building, structure, or site element.
All objects must remain in their exact coordinates and footprint.


Building Height Constraint (STRICT – NO CHANGE PERMITTED):

The building height must remain exactly the same as the original illustration.
Do NOT increase or decrease wall height.
Do NOT add additional levels, intermediate floors, or vertical extensions.
Steel framing MUST terminate at the exact same top-of-wall height as the original structure.
Roof truss springing height and top-of-structure level must remain unchanged.


Construction Stage Update (ONLY permitted building change):

Remove all external wall cladding and solid wall elements.
Replace these with exposed blue structural steel framing (columns, studs, beams).
Ensure framing aligns precisely with original wall positions and building footprint.
Do NOT alter spacing, grid, or structural layout beyond replacing the wall material.


Roof Structure Control (STRICT):

Keep all roof trusses in EXACTLY the same positions as shown.
All trusses must run vertically in the same direction across the building.
The roof is flat — no pitch, no gables, no angled or triangular trusses.
Do NOT change truss height, spacing, orientation, or geometry.
Do NOT add roof sheeting — maintain open truss stage only.


Site Office Control:

Ensure there are only two site offices.
Position them side-by-side at ground level.
Do NOT stack, duplicate, or relocate them.


Reference Image Matching (Sequence Consistency):

Match the reference image exactly for:

Background environment
Lighting and shadow direction
Colour tone, grading, and realism


Update site fencing to match the reference:

Blue mesh panel fencing
Correct spacing, height, posts, and base supports
Maintain identical fence alignment and perimeter




Site & Context Controls:

Do NOT modify site layout, ground levels, access roads, or surrounding buildings.
Do NOT add or remove any vehicles, plant, vegetation, or materials.
Keep all existing elements exactly as per the base image.


Sequence Consistency Requirements:

Ensure full alignment with previous and future sequence frames
Maintain identical:

Camera framing
Lighting conditions
Scale and proportions




Rendering Quality:

Photorealistic output
Clean, sharp blue steel framing with accurate proportions
Realistic shadows cast from trusses and framing


STRICT CONSTRAINTS:

Do NOT change building height or levels
Do NOT alter perspective, footprint, or proportions
Do NOT introduce new geometry or structural interpretation
ONLY modify:

Wall removal → steel framing replacement
Maintain flat vertical trusses
Site office correction
Fencing + visual match to reference

Create renders like this

Turn any photo, sketch, or floor plan into a photoreal render in seconds.