Skip to content
Render tools
Create a high-quality photorealistic aerial render by MODIFYING the provided image only.

CRITICAL – CAMERA / POSITION / GEOMETRY LOCK:
- Use the provided aerial image as the exact base image.
- DO NOT change the camera position, angle, zoom, or perspective.
- DO NOT move, rotate, resize, stretch, scale, or shift the building or any site elements.
- Maintain pixel alignment with the original image.
- This is an in-place edit only.

CRITICAL – BUILDING SIZE MUST REMAIN EXACT:
- The building footprint, length, width, height, and proportions must remain EXACTLY as shown in the original image.
- Do NOT adjust wall positions, roof extents, courtyard size, or overall building scale.
- The façade must be applied onto the existing mass without altering any dimensions.
- Treat the existing building as a fixed bounding box that cannot be changed.

SITE / BUILDING LOCK:
- Maintain the exact building footprint, courtyard opening size and position, fencing, roads, and site layout.
- Maintain the square building geometry with central courtyard exactly as shown.
- The courtyard void must not increase or decrease in size.

PRIMARY TASK – APPLY FINAL FACADE (WITHOUT CHANGING MASS):
- Replace the plain white mass with the finished architectural façade using the reference render.
- The façade must be WRAPPED onto the existing geometry.
- DO NOT reinterpret or rebuild the building form.
- DO NOT extend, compress, or reshape any elevation.

FACADE REQUIREMENTS (CONTROLLED APPLICATION):
- Match the design language of the reference façade:
  - Horizontal and vertical metal fins / screening
  - Folded metal cladding appearance
  - Controlled glazing openings
  - Feature entry elements (orange/yellow highlight)
- IMPORTANT: 
  - Align façade elements proportionally to the existing façade faces
  - Scale façade elements to fit the existing building dimensions (not the other way around)
- Avoid repeating or stretching façade bays incorrectly.

ROOF:
- Keep the roof EXACTLY as per the base model geometry.
- Do NOT change roof size, pitch, or edge location.
- Apply realistic roofing material only (sheet metal, flashings, gutters).

COURTYARD – MATCH REFERENCE BUT KEEP SIZE:
- Convert courtyard into a landscaped space based on the reference render.
- KEEP courtyard size, shape, and position exactly as shown.
- Insert landscape elements within this fixed area only.

LANDSCAPE PLAN – 2D TO 3D CONVERSION:
- Convert the imported landscape drawing into fully 3D external works.
- Follow the drawing geometry exactly—no shifting or reinterpretation.
- Include:
  - paths and paving
  - planting zones
  - swales / drainage features
  - seating / edges where indicated

- Do NOT extend landscape beyond drawn boundaries.

BACKGROUND BUILDINGS:
- Convert all 2D background buildings into realistic 3D models.
- Maintain their exact footprint and location.
- Do NOT redesign or relocate.

ENVIRONMENT:
- Maintain the dry industrial Stanwell Power Station context.
- Keep terrain and surroundings consistent with the original aerial image.

LIGHTING:
- Match existing lighting direction and shadows exactly.
- Natural daylight only.

DETAILING:
- Apply realistic materials:
  - metal cladding
  - aluminium framing
  - concrete / paving
  - vegetation consistent with Central QLD context
- Add subtle wear, shadows, and grounding.

STYLE:
- Photorealistic, clean, and tender-ready.
- No stylisation or artistic reinterpretation.

STRICT RESTRICTIONS:
- Do NOT change building size under ANY circumstance.
- Do NOT scale façade to a new building form.
- Do NOT modify footprint, height, or courtyard geometry.
- Do NOT rebuild the building — only apply façade to the existing form.

OUTPUT:
- A photorealistic aerial render where:
  - The building remains EXACTLY the same size and position as the original model
  - The façade is applied accurately to that fixed geometry
  - The courtyard and landscape are fully realised in 3D
  - All background buildings are converted to 3D

Create renders like this

Turn any photo, sketch, or floor plan into a photoreal render in seconds.