- Prompt
- Use the provided image as the fixed base reference. Do not change camera angle, perspective, framing, scale, building positions, or introduce any new objects or scenery. Maintain all existing site features exactly as shown. Apply the following targeted modifications only: Site fencing (blue panels): Convert all blue solid site fencing panels to blue mesh construction fencing, maintaining the same alignment, height, post spacing, and layout. Remove secondary fencing: Identify and remove the internal/secondary chainwire fence so only the main perimeter fencing remains. Slab surface: Change all slab areas from light/grey concrete to a black tarp covering, with subtle realistic folds while remaining tight to the slab geometry. Formwork edge cleanup: Reduce excess concrete “poppingâ€/spill around the slab perimeter to create a cleaner, more controlled edge while still looking realistic. Timber propping: Remove all timber propping/bracing around the perimeter of the slab, ensuring formwork remains intact and structurally consistent without visible props. Strict constraints: Do not alter slab geometry, layout, or dimensions. Do not move workers, equipment, materials, or site buildings. Do not modify roads, background, or surrounding environment. Do not add new elements or enhance beyond realistic construction conditions. Output must remain photorealistic, preserving the original lighting, shadows, and site conditions.
- Created
- June 24, 2026