Skip to content
Render tools
Create a photorealistic aerial construction visualisation for Rockhampton Sports Precinct – Stage 7 Youth Precinct & Landscaping.

GEOMETRY LOCK INSTRUCTION

The supplied overlay drawing is a fixed construction plan.

Do not redesign the project.

Do not reinterpret the layout.

Do not move any element.

Do not resize any element.

Do not add any element.

Do not remove any element.

All courts, roads, buildings, carparks, pathways and landscape areas must remain exactly where shown on the overlay.

The overlay is not a concept.

The overlay is the final approved layout.

Render only what is shown.

If uncertain, preserve the overlay geometry exactly.

CRITICAL INSTRUCTION

Use the supplied overlay image as the master reference.

Maintain the EXACT:

- camera angle
- aerial viewpoint
- image extent
- orientation
- scale
- zoom level
- court layout
- carpark layout
- building locations

Do not rotate the site.

Do not crop the site.

Do not change the project footprint.

Do not alter any geometry shown on the overlay.

The overlay controls all locations.

Only construct works where shown on the overlay.

CAMERA REQUIREMENTS

Use a near-vertical bird's-eye drone perspective.

The image should appear as the same aerial photograph taken later during construction.

The entire site must remain visible.

PROJECT STATUS

Netball courts are complete.

Carparks are substantially complete.

Clubhouse and amenities buildings are substantially complete.

Youth Precinct construction and landscaping are now underway.

The project should appear approximately 90-95% complete.

NETBALL COURTS

Maintain the exact court arrangement shown on the overlay.

Show:

- Completed blue playing surfaces.
- Red perimeter surfacing.
- White line marking.
- Goal posts installed.
- Chainwire fencing complete.
- Sports lighting installed.

Do not alter court locations.

Do not add courts.

Do not remove courts.

CARPARKS

Maintain the exact carpark layout shown on the overlay.

Show:

- Asphalt complete.
- Line marking complete.
- Wheel stops installed.
- Lighting poles installed.

No additional parking areas.

BUILDINGS

The light grey building footprints define the exact building locations.

Maintain the exact footprint size.

Do not enlarge any building.

The small amenities building near the road must remain small.

Do not increase its footprint.

Do not create additional buildings.

YOUTH PRECINCT

Use the overlay layout exactly.

Show:

- Youth precinct structures under construction.
- Small shelters and recreation elements shown only where indicated.
- Pathways being installed.
- Concrete hardstand areas under construction.
- Playground elements being installed.
- Recreation equipment partially installed.
- Construction crews working throughout the precinct.

Do not create additional facilities.

LANDSCAPING

Landscaping has commenced but is not complete.

Show:

- Newly planted trees.
- Newly planted garden beds.
- Fresh mulch.
- Turf installation underway.
- Irrigation installation.
- Batter stabilisation completed.
- Landscape crews working.
- Some areas remaining as exposed construction soil.

Do not show mature landscaping.

Do not show fully established vegetation.

Do not show a finished parkland appearance.

The landscaping should appear newly installed.

VISUAL STYLE

Photorealistic aerial drone photography.

Government infrastructure project.

Professional tender methodology visual.

Construction sequencing storyboard.

Natural Queensland lighting.

High realism.

The image should clearly represent the phase immediately before commissioning and practical completion.

NO additional courts.

NO additional buildings.

NO enlarged amenities building.

NO enlarged clubhouse.

NO parking outside the overlay footprint.

NO mature landscaping.

NO fully established gardens.

NO large trees.

NO completed public park appearance.

NO crowds.

NO events.

NO project handover appearance.

NO completed practical completion stage.

NO alteration of site geometry.

NO alteration of building footprints.

NO alteration of court layout.

NO alteration of carpark layout.

The overlay has absolute priority over realism.



Create renders like this

Turn any photo, sketch, or floor plan into a photoreal render in seconds.