- Prompt
- Use the provided construction sequence image as the base model and maintain the scene geometry EXACTLY as shown. Camera & Geometry Lock (CRITICAL): Maintain the exact camera position, angle, lens, perspective, and framing. Do NOT move, rescale, rotate, or reinterpret any building, structure, or site element. All objects must remain in their exact coordinates and footprint. Construction Stage Update (ONLY permitted building change): Remove all external wall cladding and solid wall elements. Replace walls with exposed blue structural steel framing (columns, studs, beams) aligned exactly to the original wall layout. Ensure framing is consistent, evenly spaced, and true to the building geometry. Roof Structure Control (STRICT): Keep all roof trusses in EXACTLY the same positions as shown. All trusses must run vertically (parallel direction across the building). The roof is flat — no pitch, no gables, no angled trusses. Do NOT introduce any sloped framing, ridge lines, or triangular roof forms. Do NOT add roof sheeting — maintain open truss stage only. Site Office Correction (CRITICAL FIX): Ensure there are ONLY two site offices. Position them side-by-side on the ground, not stacked. Maintain their original location and alignment relative to the site. Do NOT duplicate, elevate, or stack any additional offices. Reference Image Matching (Consistency Across Sequence): Match the reference image exactly for: Background environment Lighting, shadows, and time of day Colour tone and realism level Update site fencing to match the reference exactly: Blue mesh panel fencing Correct post spacing, height, and base supports Maintain the exact existing fence alignment and perimeter shape Site & Context Controls: Do NOT change site layout, ground levels, access roads, or surrounding buildings. Do NOT add or remove any plant, vehicles, vegetation, or materials. Keep all existing elements exactly as per the base image. Sequence Consistency Requirements: Output must align perfectly with other sequence frames Maintain identical: Camera framing Shadow direction and intensity Colour grading and exposure Rendering Quality: Photorealistic output Clean, sharp steel framing with accurate material finish (painted blue steel) Realistic shadow casting from trusses and framing STRICT CONSTRAINTS: Do NOT change perspective, building size, or layout Do NOT introduce new structures or scenery Do NOT alter roof geometry beyond stated constraints ONLY modify: Wall removal → steel framing replacement Roof truss direction clarification (vertical only) Site offices correction Fencing + visual match to reference
- Created
- June 25, 2026