Skip to content
Render tools
Using the supplied demolition render as the primary and only reference image, create the next construction sequence showing concrete slab construction works underway.

Critical Instruction

This is an image progression task, not a new scene creation task.

Treat the demolition render as the source image.

Maintain exactly:

Camera position
Camera angle
Camera height
Perspective
Image composition
Lighting
Shadows
Roads
Vegetation
Neighbouring houses
Industrial buildings
Drainage corridor
Site fencing
Site access

The finished image should look like the demolition render photographed several weeks later from the exact same drone location.

Existing Building Retention

The existing retained building located at the rear of the site must remain exactly as shown in the demolition render.

Do not:

Remove the retained building.
Relocate the retained building.
Change the size of the retained building.
Modify the roof shape.
Modify the building footprint.

The retained building is fixed geometry and must remain unchanged.

Construction Progress

Replace demolition activities with concrete slab construction works.

Show:

Concrete slab construction underway.
Concrete slab only within the nominated construction area.
Concrete pump truck.
Concrete agitator trucks.
Reinforcement mesh.
Formwork.
Finishing crews.
Active concrete placement.

The slab should be approximately 60-70% complete.

Site Preservation

Everything outside the active construction zone must remain unchanged from the demolition render.

Retain:

Hutchinson Builders fencing.
Existing roads.
Existing landscaping.
Existing neighbourhood.
Existing industrial buildings.
Existing drainage corridor.
Existing retained building.
Most Important Instruction

Create the new image by editing the demolition render only. Keep all existing buildings, roads, fencing, background, vegetation and perspective exactly as shown. The only change should be replacing demolition works with active concrete slab construction. The retained building at the rear of the site must remain exactly where it is and must not be altered or removed.

Success Criteria

If the demolition render and slab render are placed side by side:

✅ Same camera position
 ✅ Same background
 ✅ Same fencing
 ✅ Same retained building
 ✅ Same road network
 ✅ Same surrounding development

The only obvious difference should be that demolition works have progressed to concrete slab construction.

Create renders like this

Turn any photo, sketch, or floor plan into a photoreal render in seconds.